Project track record

Forty-one delivered contracts across industrial, municipal and hospital wastewater — several of which we still operate under contract.

Naqu, Tibet Altitude ≈ 4,500 m Reporting period 07/2025 – 06/2026

Naqu Municipal Wastewater Plant — Phase 1 & 2 operations

A 40,000 m³/day municipal works on the Tibetan plateau, operated by us through our local subsidiary. Winter influent arrives at 5–8 °C and the bioreactors sit near 3 °C, which suppresses biological treatment by 30–50%. We hold the standard through it by dosing our own cold-tolerant cultures from October to April, rebuilding the failure-prone mechanical equipment, and running the plant on predictive maintenance rather than waiting for breakdowns.

Effluent COD
13.42 mg/L
from 42.12 · −68.1%
Ammonia nitrogen removal
92.4%
held through winter
Total phosphorus removal
67.5%
tertiary polishing
Throughput
40,000 m³/d
from 25,000 · +61.5%
Figures as reported in our June 2026 project review. Operated with our wholly-owned local subsidiary, Tibet Yuancheng Energy & Environmental Technology Co., Ltd.
Municipal clarifier under emergency remediation
Yanting, Sichuan · 2021

Industrial park plant — emergency rescue

A CASS plant with a design flaw, discharging over limits long enough to be named in a provincial environmental inspection. We rebuilt the biology, retrofitted the hydrolysis-acidification tank and added catalytic oxidation. Compliant and stable within four months of starting.

5,000 m³/d · COD 200–300 → ≤ 50 mg/L
Tertiary treatment stage at the Changle industrial park plant
Changle, Shandong · operating

Sapphire industrial park — tertiary treatment

We built and still operate the advanced treatment stage on this industrial park works. It is the longest continuous record we have of the catalytic oxidation process running on real, varying industrial effluent.

≈ 60% COD removal · 23 M m³ treated to 02/2022
Tannery wastewater treatment plant at Rugao
Rugao, Jiangsu · 2 years O&M

Sheepskin tannery — retrofit and operation

Chloride above 10,000 mg/L and high sulphide had left the biology barely alive, with COD and ammonia over limits for a long period. Process retrofit plus salt-tolerant COD- and ammonia-degrading cultures at start-up. We then operated the plant for two years.

Cl− > 10,000 mg/L · stable compliance
Every project, listed

Forty-one delivered contracts

The complete list, not a selection. All of it is in China — we have not yet delivered a project in Africa, and we would rather say so than imply otherwise.

Send us your water analysis. We will send back a process and a price.

An incomplete enquiry is still worth sending — tell us the flow and what is failing, and we will tell you what we would do.